A panel upgrade is one of the larger electrical bills a Phoenix homeowner pays, and the range is wide. Here is what published cost guides say, what the permit and the utility add, and why amp size is only part of the price.
Quick cost estimator
Typical ranges from the sources cited below, not a quote. The company you hire will price the actual job.
What the published numbers say
Angi lists a Phoenix panel replacement at $450 to $2,110. HomeAdvisor's national range for upgrading a 100-amp panel to 200 amps is $750 to $2,000, and a 400-amp panel or service upgrade runs $2,000 to $4,000 nationally. Meter box work in Phoenix is listed at $100 to $650. These are published ranges, not quotes, and the Phoenix and national figures come from different surveys, so do not expect them to line up exactly.
Electrician Phoenix is a free referral service, not an electrical contractor. The electrician you are connected with provides the actual price for your house.
| Item | Range | Area |
|---|---|---|
| Panel replacement | $450 to $2,110 | Phoenix |
| Meter box | $100 to $650 | Phoenix |
| Upgrade 100 to 200 amp | $750 to $2,000 | National |
| 400-amp panel or service upgrade | $2,000 to $4,000 | National |
| Whole-home surge protector | $200 to $800 | National |
Panel replacement versus service upgrade
The words get mixed up, but the jobs differ. Replacing a panel swaps the box and breakers while the incoming service stays the same size. Upgrading the service raises the amp rating, which may mean a new meter base, a larger service mast and heavier conductors from the street. The second job costs more and involves the utility. Our pages on panel upgrades in Phoenix and the service upgrade job cover each in turn.
100, 150 or 200 amps: which size do you need
A 100-amp service was normal in many older central Phoenix, Tempe, Mesa and Glendale homes, and some of the oldest still have 60 amps or a fuse box. A 200-amp service is standard in most newer master-planned subdivisions. In a Phoenix house, the number to compare is what the home runs at once on a July afternoon: central AC, a pool pump, an oven and maybe a dryer. Adding an EV charger, a hot tub or a second AC unit is the usual reason owners outgrow what they have. An electrician can do a load calculation to say whether 100, 150 or 200 amps fits, and that is better than guessing from the age of the house.
Why the price swings so much
- Where the panel sits: a panel in a hot garage or on an exterior stucco wall can be easier or harder to reach than one in a closet.
- Relocation: if the utility requires a different meter or disconnect location, the project grows.
- Condition of the wiring: old branch circuits, aluminum wiring or double-tapped breakers have to be corrected during the swap.
- Brand of the old panel: some older brands, such as Federal Pacific Stab-Lok and Zinsco, are ones electricians often recommend replacing.
- Extras: surge protection, new grounding or a new meter base add to the total.
If the house has aluminum branch wiring from the mid-1960s to mid-1970s, read about aluminum wiring in Arizona before the panel work begins, since connections matter during a swap.
Permits and the Phoenix process
The City of Phoenix Planning and Development Department says replacing a service disconnect switch or breaker needs a permit, and that service upgrades, replacements and repairs for services up to 200 amps can be permitted over the counter. Plan submittal is required for 400-amp or larger services and for new electric sub-panels. Outside Phoenix, the permit office is the city or county building department, and our guide to electrical permits across the Phoenix area explains the differences. Ask the electrician whether the permit fee is in the quote and who arranges the inspection.
What APS and SRP control
The utility owns the meter and the connection to the street, and it decides where the meter and service equipment go. APS says it alone determines meter and service locations, that it seals the meters, and that anyone tampering with a seal commits a violation. All work has to meet APS requirements and the local inspection authority's rules. SRP says its Distribution Design group must approve service entrance and meter locations before construction, that service entrances rated 400 amps or larger go to SRP for approval first, and that an electrical clearance from the local authority is needed before power is restored after changes. In practice, the electrician coordinates the shutoff and reconnection, and the schedule depends on the utility as much as on the contractor.
What to expect on the day
A typical panel swap involves shutting off power to the house for several hours, so plan around the heat. Many owners start early in the day, set the thermostat down ahead of time and keep water and fans handy. Frozen food and sensitive equipment also deserve a plan. After the work, a city or county inspector checks it, and the utility restores or confirms service. Never open a panel yourself; the main lugs stay live even with the breakers off.
Other jobs that often ride along
Since the panel is open anyway, many owners add whole-home surge protection, which helps after monsoon storms. See the whole-home surge protection page for how it works. If the panel is warm, scorched or buzzing, that is a repair question before it is an upgrade question: read about electrical panel repair. For sparks or a burning smell, leave the house and call 911 first.
Older homes and what gets found during the swap
Panel work often turns up other issues. In a 1940s to 1960s house the electrician may find ungrounded circuits, two-prong outlets, cloth-covered wire or a service that was never sized for modern AC. Homes from about 1965 to the mid-1970s may have aluminum branch wiring, which the CPSC says seldom gives easily detected warning signs when connections fail. A good estimate says what happens if the electrician finds such problems: whether the price holds, what a change order looks like and who decides. It also helps to have the work scoped before demolition day, and a pre-purchase or pre-project inspection is one way to do that.
Solar, EVs and pools change the size you need
Rooftop solar needs an interconnection application with the utility, and APS and SRP both require it before the system is installed. A solar installer may ask for a panel upgrade first, because a busbar that is too small for the added breaker is a common limit. EV chargers, hot tubs and pool equipment each add continuous load, which is why homeowners planning those often upgrade the panel at the same time. Look at the EV charger installation page and the pool and spa electrical page if either is on your list.
Questions to ask before you sign
- Is the permit, the inspection and the utility coordination in the price?
- How many hours will the power be off, and what happens if the utility reconnect is delayed?
- Will the new panel have spare slots, and is whole-home surge protection included?
- What happens to the old branch wiring that is found in poor shape?
Check the ROC number
An electrician working on a panel should hold an ROC license, and a permit-required job is never exempt. The ROC lists R-11 for residential electrical, C-11 for commercial and CR-11 for dual work, and its contractor search on roc.az.gov is free. Our overall electrician cost guide lists comparison questions to ask every bidder.
Timing and scheduling
Because a panel job cuts power to the whole house, the schedule is worth asking about. Permit review, the utility's meter work and the electrician's own calendar all play a part, and summer can stretch each of them. Many owners book the work in the cooler months and ask the electrician to confirm the power-off window in advance, since nobody can promise an exact arrival or finish time.
Bottom line
Budget anywhere from a few hundred dollars for a straightforward Phoenix panel replacement to $2,000 to $4,000 for a 400-amp service, with the permit, the utility and the condition of the old wiring deciding where you land. Get the scope in writing and compare like with like.
Frequently asked questions
How much does a panel upgrade cost in Phoenix?
What does a 400-amp service cost?
Do I need a permit to replace a panel in Phoenix?
Who handles the meter, the electrician or APS and SRP?
How do I know if I need 200 amps?
Sources
- Angi: Phoenix, AZ electrical panel replacement cost
- HomeAdvisor: Upgrade or replace an electrical panel
- HomeAdvisor: Whole House Surge Protector Installation Cost
- City of Phoenix Planning and Development: electrical permit requirements
- APS Electric Service Requirements Manual, section 300
- SRP Electric Service Standards: Metering
- Arizona Registrar of Contractors: License Classifications
Last updated: