A new panel is a replacement of the box that feeds every circuit in the house, not just a part swap. It normally needs a permit, an inspection and a short planned outage. Call the number on this page to be connected with a local electrician in Mesa.

Is it the panel or the circuit?
One breaker that trips on one appliance is often a circuit problem, not a panel problem. A panel upgrade enters the conversation when the trouble is house-wide: everything is crowded, the service is small, or the equipment itself looks worn, hot or discolored.
Upgrade or add a subpanel?
Sometimes a subpanel in the garage or casita solves the space problem without replacing the main. If the main service itself is small, old or damaged, a subpanel only moves the problem. An electrician can tell you which fits your house after reviewing the loads.
With a median build year of 1988 here, many panels are original or have had circuits added over time, so a load check is a sensible first step.
Service in Mesa is split between SRP and Mesa Electric, and the utility steps for a panel swap depend on which one owns your meter.
Utility steps can add scheduling
Because the utility owns the meter, the power must often be disconnected and reconnected by the utility around the electrician's work. That coordination does not change what the electrician charges, but it can affect how the project is scheduled and how long the house is without power.
Utility, permits and safety in Mesa
Two utilities serve Mesa: SRP and Mesa Electric. The name on your bill tells you which one to call when the power goes out; SRP takes outage reports at (602) 236-8888.
Treat any fallen power line as live. APS and SRP both tell people to stay about 100 feet away and call 911. Inside the house, smoke or a hot burning odor from electrical equipment is also a 911 call, made from outside.
Electrical permits for Mesa addresses go through Mesa Development Services. Panel and service upgrades, new circuits and generator hookups usually need one, followed by an inspection.
Arizona's handyman exemption does not cover jobs that need a permit, so panel work, new circuits and similar jobs belong with a contractor who holds an ROC electrical license (R-11 or CR-11).
Solar, battery and some generator setups need the utility's approval before they are connected. Electricians who do this work handle the application.
Electricians who take calls here often also work in Gilbert, Tempe and Chandler.
After the new panel is in
Walk the house with the electrician and confirm every circuit works and every room has power. Ask for the panel directory to be filled out legibly. Keep the inspection sign-off with your home records, since a buyer or insurer may ask for it later.
Keep records of the work
Hold on to the permit, the inspection result and the final panel directory. Insurers and home buyers sometimes ask for proof of an updated panel, and the records help the next electrician understand what was installed and which circuits feed which parts of the house.
Electrical Panel Upgrade questions in Mesa
How long will the power be off during an upgrade?
Will I need a new meter base too?
Do I need an upgrade before installing an EV charger?
What is the difference between a panel upgrade and a service upgrade?
More electrical services in Mesa
Electrical Panel Upgrade nearby
Helpful guides
Sources
Last updated: